Boeing 7E7 Dreamliner
(8 pics)
Artists impression Boeing. Flight deck, revealed Sept. 1st 2005 Artists impression (Boeing) Artists impression (Boeing) Artists impression (Boeing) Artists impression (Boeing)
Artists impression Boeing.
The Boeing 7E7 Dreamliner
(from January 28, 2005 will be known as the Boeing 787 Dreamliner) is a
super-efficient airplane with new passenger-pleasing features. It will bring the
economics of large jet transports to the middle of the market, using 20 percent
less fuel than any other airplane of its size. Customers will enjoy forty- to
sixty-percent more cargo revenue capacity.
In addition to improving
airplane performance and team efficiency, computational fluid dynamics and wind
tunnel testing contribute to safety, the ultimate design goal.
More than 15,000 hours of
wind tunnel time will be logged to develop the Boeing 7E7.
Boeing 7E7 Configurations:
- Boeing 7E7-300 Dreamliner,
optimized for shorter flights, will carry 289 passengers in two classes up to
6.500 kilometers.
- Boeing 7E7-800 Dreamliner
will carry 217 passengers in three classes, with a range of up to 15.700
kilometers.
- Boeing 7E7-900 Dreamliner,
a longer version of the 7E7-800, will carry 257 passengers in three classes up
to 15,400 kilometers.
The Boeing Company's board
of directors has approved the formal launch on April 26th, 2004 of the new 7E7
Dreamliner passenger jet based on firm order for 50 7E7s from ANA (All Nippon
Airways) and the overall strong business case for the new airplane. The ANA
order is the largest launch order in history for a new Boeing commercial jet.
Production will begin in 2006. First flight is expected in 2007 with
certification, delivery and entry into service occurring in 2008
Large 7E7 assemblies will be transported to
the final assembly site on board modified 747-400s. This transport plan will
result in saving of 20 to 40 percent over traditional shipping methods and
reduce the amount of time it takes the large parts to arrive at the final
assembly site from as many as 30 days to only one day. Boeing estimates the
savings of using air transport instead of shipping will be recouped within the
first few years of production of the 7E7.